Engineering infrastructure
Capacity |
|
|
ELECTRICITY |
8 MW |
|
WATER |
94,6 m³ / hour |
|
SEWAGE |
92,3 m³ / hour |
|
GAS |
30 000 m³ / hour |
|
Energy supply rates
ELECTRICITY (KW) |
₽ 2,12 |
|
WATER (М3) |
₽ 28,62 |
|
SEWAGE (М3) |
₽ 31,1 |
|
GAS (1000 М3) |
₽ 5 316,93 |
|
Free of charge technological connection
|
off-site (RUR)
|
Industrial park «Chistopol»
|
ELECTRICITY (KW) |
38 848 thous. |
Free |
WATER (M³) |
6 135 thous. |
Free |
SEWAGE (M³) |
4 407 thous. |
Free |