Русский English
+7 (843) 227-41-40

Engineering infrastructure

abcac5bb9ece5778555ba3aabc94b544.jpg

 Capacity



ELECTRICITY

     8 MW


WATER

                 94,6 m³ / hour


SEWAGE

                 92,3 m³ / hour


GAS

              30 000 m³ / hour   



Energy supply rates

ELECTRICITY (KW)

     ₽ 2,12


WATER (М3)

            ₽ 28,62     


SEWAGE (М3)

     ₽ 31,1


GAS (1000 М3

                   5 316,93     




Free of charge technological connection

 

off-site (RUR)

Industrial park «Chistopol»

ELECTRICITY (KW) 

 38 848 thous.

Free

WATER (M³)

6 135 thous.

Free

SEWAGE (M³)

4 407 thous.

Free


Русский English